ContractBeam
The Registry

Browse opportunities

VAAgency: VETERANS AFFAIRS, DEPARTMENT OFStatus: incl. closedclear all
Contract1 day left

6515--GORE TUNNELERS SPS - Cinci

This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation for quote to be requested with no other form of written solicitation to be issued. This solicitation RFQ-36C25026Q0643 is issued as a request for quotes (RFQ). The solicitation incorporates the provisions and clauses in effect as of the Revolutionary FAR Overhaul. This is a solicitation only pertaining to Gore Tunnelers. Note: this is a Brand Name item(s) solicitation, firm fixed price solicitation. The North American Industrial Classification System (NAICS) code is 339112, with a small business size standard of 1000 Employees. The FSC/PSC is 6515. Vendor to supply necessary materials and/or parts for the requirements listed below to be delivered to: Cincinnati VA Medical Center (539), 3200 Vine St, Cincinnati, OH 45220, FOB destination. All interested companies shall provide quotations for the following brand name equipment and supplies: Requirement 1: Item # Mfg. Part Number Description Qty 1 TUN6C025-HANDLE GORE 6mm HANDLE ONLY for Fully Curved Tunneler 1 2 TUN6C025-6S GORE Full Curve Vascular Tunneler 6mm Sleeve Only 1 3 TIP06 Vascular Tunneler Tip, (6mm) 4 4 200-248 GORE TUNNELER STERLIZATION TRAY Internal Dims 31" x 10" x 2.5" 1 5 TUN06025-HANDLE GORE 6mm HANDLE ONLY for 25cm Slightly Curved Tunneler 2 6 TIP08 Vascular Tunneler Tip, (8mm) 3 7 UN06025 GORE Vascular Tunneler Set SLIGHT CURVE (6mm × 25cm) 1 8 TUN6802-C GORE 8mm SHEATH ONLY FOR 25cm Slightly Curved Tunneler Kit 2 9 TUN6802-B GORE 6mm SHEATH ONLY FOR 25cm Slightly Curved Tunneler Kit 1 10 TUN60865-6S GORE XL Vascular Tunneler 6mm Sleeve Only 1 11 TUN60865-8S GORE XL Vascular Tunneler 8mm Sleeve Only 1 12 TUN60865-HANDLE GORE XL 65cm Vascular Tunneler Handle Only 1 Offerors must comply with all instructions contained in provision 52.212-1, Instructions to Offerors-Commercial, which applies to this acquisition. Submit signed and dated offers to the office specified in this solicitation at or before the exact time specified in this solicitation. Offers may be submitted on the SF 1449, letterhead stationery, or as otherwise specified in the solicitation. Offerors must complete annual representations and certifications electronically via the System for Award Management (SAM) website located at https://www.sam.gov/portal in accordance with FAR 52.212-3, Offerors Representations and Certifications Commercial Items. If paragraph (j) of the provision is applicable, a written submission is required. The following additional FAR provisions apply: 52.212-4, Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. 52.212-5, Contract Terms and Conditions-Commercial Items. The following additional clauses apply: Purchase order (SF 1449) will be awarded to the winning bid with submission of Invoice through Tungsten upon delivery of ALL items listed on spreadsheet. From the VAAR the following apply: 852.232-72 Electronic submission of payment requests. All invoices must be submitted to Tungsten for payment processing. The PO number must appear on all invoices, packing slips, shipping labels, and/or correspondences to the contracting officer. 852.246-71 Inspection of all parts will be held. If goods are rejected, they will be held for 15 days, if not replaced, the rejected merchandise will be returned to the contractor at their risk and expense. Payment of invoice will be delayed. All quoters shall submit the following: Pricing quote and estimated schedule for delivery. All warranty and service as…

AgencyVETERANS AFFAIRS, DEPARTMENT OF
NAICS339112
SAM.gov· Posted Jun 16, 2026#36C25026Q0643
ContractService-Disabled Veteran-Owned Small Business Set Aside1 day left

6110--689-26-3-4807-0126: Replace Variable Frequency Drive Units (VA-26-00053945)

Amendment No.: 0002 Solicitation No.: 36C24126Q0551 Date: June 16, 2026 Purpose of Amendment The purpose of this amendment is to provide responses to questions submitted regarding the solicitation. As a result of these questions and responses, the response due date will be extended to June 23, 2026 at 10am. Question: Please clarify if a superintendent can be a dual hat to cover the requirements of SSHO? Answer: This is not construction, this is a professional services contract. Construction management is not required. A site superintendent is not required for professional services contracts. Applicable persons performing certified labor shall meet OSHA requirements for the applicable work area and work being performed where qualified personnel perform equipment start up and verification.   Question: If no to the question above, will the SSHO need to be full-time for this project? Answer: This is not construction, this is a professional services contract. Construction management is not required. A site superintendent is not required for professional services contracts. Applicable persons performing certified labor shall meet OSHA requirements for the applicable work area and work being performed where qualified personnel perform equipment start up and verification.   Question: Please clarify if a superintendent can be a dual hat to cover the requirements of QA/QC? Answer: This is not construction, this is a professional services contract. Construction management is not required. A site superintendent is not required for professional services contracts. Applicable persons performing certified labor shall meet OSHA requirements for the applicable work area and work being performed where qualified personnel perform equipment start up and verification.   Question: If no to the question above, will the QA/QC need to be full time for this project? Answer: Personnel performing startup of equipment should be those with the qualifications necessary to the specific equipment. Please submit appropriate installation report(s) as required along with equipment warranties. Question: Can a superintendent be a triple hat to cover the requirements of SSHO and QA/QC? Answer: This is not construction, this is a professional services contract. Construction management is not required. A site superintendent is not required for professional services contracts. Applicable persons performing certified labor shall meet OSHA requirements for the applicable work area and work being performed where qualified personnel perform equipment start up and verification.   Question: Please confirm if tax should be included in our proposal? Answer: This is not construction, this is a professional services contract. Construction management is not required. A site superintendent is not required for professional services contracts. Applicable persons performing certified labor shall meet OSHA requirements for the applicable work area and work being performed where qualified personnel perform equipment start up and verification.   Question: Advise what is the ICRA Level required for the areas of the VFDs. Answer: This question has been addressed previously. The contractor is responsible for determining any applicable tax obligations, incorporating into proposals as necessary. The VA cannot provide tax advice or make tax determinations on behalf of the contractor. Question: Is the use of temporary plastic wall panels (such as STARC panels) acceptable to meet ICRA requirements? Answer: The VFD's are in multiple mechanical spaces throughout the facility. There's no single ICRA level that applies to all locations. The Contractor shall coordinate with the government prior to commencing work in each area as the ICRA requirements will be determined based on the specific location, adjacent patient care activities, and scope of work. Question: Confirm project work hours. Can work be completed during normal work hours? Answer: The acceptability of temporary c…

AgencyVETERANS AFFAIRS, DEPARTMENT OF
NAICS238220
PlaceWest Haven, CT
SAM.gov· Posted Jun 16, 2026#36C24126Q0551